M2018-01 Abatement & Demolition of Front Portion of Biggs Building-Fulton State Hospital

The Work consists of asbestos abatement for the entire building, demolition of the front portion of the building, and various building system modifications of the remaining building. The Work includes: Asbestos abatement; Refrigerant recovery; Building, site, and building system demolition; Site utility modifications; Site grading and seeding; Concrete; Building closure wall installation; EPDM roofing; Fire sprinkler system modifications; Hot water boilers; Mechanical system piping and insulation; Hot water cabinet heaters; and Fire alarm system modifications.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 6/24/2021 81.8 MB
01-G-001_Title Sheet 6/24/2021 261.8 KB
02-G-002_Index Sheet 6/24/2021 480.1 KB
03-ASB-101_Asbestos Abatement Admin Ground 6/24/2021 689.7 KB
04-ASB-102_Asbestos Abatement Admin Ground 2 6/24/2021 709.7 KB
05-ASB-103_Asbestos Abatement Ward B-3 6/24/2021 719.5 KB
06-ASB-104_Asbestos Abatement Ward B-4 6/24/2021 700.8 KB
07-ASB-105_Asbestos Abatement Tunnels 6/24/2021 3.0 MB
08-ASB-201_Asbestos Abatement Stage 6/24/2021 662.5 KB
09-ASB-202_Asbestos Abatement Admin 2 6/24/2021 704.6 KB
10-ASB-203_Asbestos Abatement Ward B-7 2nd 6/24/2021 669.8 KB
11-ASB-204_Asbestos Abatement Ward C-5 6/24/2021 676.5 KB
12-ASB-301_Asbestos Abatement Admin 3rd 6/24/2021 620.4 KB
13-ASB-302_Asbestos Abatement Ward B-7 3rd 6/24/2021 659.7 KB
14-ASB-303_Asbestos Abatement Ward C-5 3rd 6/24/2021 656.1 KB
15-ASB-401_Asbestos Abatement Admin 4th 6/24/2021 630.3 KB
16-ASB-402_Asbestos Abatement Ward B-7 4th 6/24/2021 638.9 KB
17-ASB-403_Asbestos Abatement Ward C-5 4th 6/24/2021 628.7 KB
18-REF-101_Refrigerant Mechanical 6/24/2021 3.4 MB
19-REF-102_Refrigerant Admin Ground 6/24/2021 1.7 MB
20-REF-103_Refrigerant Ward B-3 6/24/2021 1.0 MB
21-REF-104_Refrigerant Ward B-2 6/24/2021 1.1 MB
22-REF-105_Refrigerant Admin Ground 6/24/2021 1.0 MB
23-REF-201_Refrigerant Ward B-7 2nd 6/24/2021 1.0 MB
24-REF-202_Refrigerant Ward C-5 2nd 6/24/2021 1.6 MB
25-REF-203_Refrigerant Ward C-6 6/24/2021 1.1 MB
26-REF-301_Refrigerant Admin 3rd 6/24/2021 1.3 MB
27-REF-302_Refrigerant Ward B-7 3rd 6/24/2021 1.2 MB
28-REF-401_Refrigerant Admin 4th 6/24/2021 2.1 MB
29-REF-402_Refrigerant Ward B-7 4th 6/24/2021 1.7 MB
30-REF-403_Refrigerant Ward C-5 4th 6/24/2021 1.0 MB
31-C-001_General Notes & Legend 6/24/2021 5.4 MB
32-C-100_Site Demo Plan 6/24/2021 11.2 MB
33-C-101_Site & Utiltiy Plan 6/24/2021 5.3 MB
34-C-102_Grading & Erosion Control Plan 6/24/2021 8.3 MB
35-C-103_SWPPP Plan 6/24/2021 7.8 MB
36-C-104_SWPPP Details 6/24/2021 5.5 MB
37-C-501_Site Details 6/24/2021 2.3 MB
38-S-001_Structural Notes 6/24/2021 224.6 KB
39-S-101_Foundation Plan 6/24/2021 234.8 KB
40-A-101_Floor Plan Roof Plan & Elevation 6/24/2021 309.9 KB
41-A-102_Wall Section & Details 6/24/2021 319.6 KB
42-MEP-001_MEP Symbols List 6/24/2021 319.8 KB
43-MEP-101_Tunnel Systems Demo Plan 6/24/2021 313.3 KB
44-MEP-201_Tunnel Section Views Page 1 6/24/2021 394.5 KB
45-MEP-202_Tunnel Section Views Page 2 6/24/2021 354.4 KB
46-FP-101_Gym Fire Protection Plan 6/24/2021 301.9 KB
47-FP-102_Dining Hall Fire Protection 6/24/2021 288.7 KB
48-FP-103_Mech Room 3 Fire Protection Plan 6/24/2021 367.6 KB
49-M-101_Campus Mechanical Plan 6/24/2021 572.9 KB
50-M-201_Mech Room 3 Enlarged Mech Plan 6/24/2021 602.3 KB
51-M-202_Gym Enlarged Mech Plan 6/24/2021 312.0 KB
52-M-203_Dining Hall Enlarged Mech Plan 6/24/2021 320.6 KB
53-M-204_Roof Plan 6/24/2021 277.6 KB
54-M-601_Equipment Schedules & Details 6/24/2021 370.9 KB
55-E-101_Existing Campus Elect Plan 6/24/2021 564.8 KB
56-E-102_Proposed Campus Elect Plan 6/24/2021 845.6 KB
57-E-103_Gym Elect Plan 6/24/2021 292.3 KB
58-E-104_Dining Hall Elect Plan 6/24/2021 295.7 KB
59-E-105_Existing Mech Room 3 Electrical 6/24/2021 328.7 KB
60-E-601_Electrical One-Line Diagram 6/24/2021 307.6 KB