M2018-01 Abatement & Demolition of Front Portion of Biggs Building-Fulton State Hospital
The Work consists of asbestos abatement for the entire building, demolition of the front portion of the building, and various building system modifications of the remaining building. The Work includes: Asbestos abatement; Refrigerant recovery; Building, site, and building system demolition; Site utility modifications; Site grading and seeding; Concrete; Building closure wall installation; EPDM roofing; Fire sprinkler system modifications; Hot water boilers; Mechanical system piping and insulation; Hot water cabinet heaters; and Fire alarm system modifications.