M2018-01 Abatement & Demolition of Front Portion of Biggs Building-Fulton State Hospital

The Work consists of asbestos abatement for the entire building, demolition of the front portion of the building, and various building system modifications of the remaining building. The Work includes: Asbestos abatement; Refrigerant recovery; Building, site, and building system demolition; Site utility modifications; Site grading and seeding; Concrete; Building closure wall installation; EPDM roofing; Fire sprinkler system modifications; Hot water boilers; Mechanical system piping and insulation; Hot water cabinet heaters; and Fire alarm system modifications.
Specifications (click to expand/collapse)
Name Date Size
01-Full Spec 6/24/2021 25.7 MB
02-Division 00 6/24/2021 3.0 MB
03-Division 01 6/24/2021 1.5 MB
04-Division 02 6/24/2021 248.9 KB
05-Division 03 6/24/2021 352.0 KB
06-Division 05 6/24/2021 113.1 KB
07-Division 06 6/24/2021 173.0 KB
08-Division 07 6/24/2021 496.7 KB
09-Division 09 6/24/2021 290.0 KB
10-Division 21 6/24/2021 457.8 KB
11-Division 22 6/24/2021 110.0 KB
12-Division 23 6/24/2021 840.2 KB
13-Division 26 6/24/2021 329.7 KB
14-Division 28 6/24/2021 127.6 KB
15-Division 31 6/24/2021 458.3 KB
16-Division 32 6/24/2021 154.8 KB
17-Division 33 6/24/2021 214.8 KB
18-Appendix 6/24/2021 18.3 MB