T2018-01 Construct 60-Man Barracks Bldg

The project includes in the Base Bid, construction of a new 60-soldier barracks building with storm shelter, Alternate No. 1 new concrete paving, Alternate No. 2 new tornado resistant window systems and associated openings in storm shelter exterior building envelope, and Alternate No. 3 new lounge area building.
Specifications (click to expand/collapse)
Name Date Size
00-Very Important MissouriBUYS Instructions Revised 05-26-20 8/14/2020 112.1 KB
01-Invitation for Bidders and addendum language 8/14/2020 103.2 KB
02-Full Spec 8/14/2020 13.2 MB
03-Division 00 8/14/2020 3.3 MB
04-Division 01 8/14/2020 2.3 MB
05-Division 02 8/14/2020 14.3 KB
05-Division 04 8/14/2020 32.2 KB
06-Division 03 8/14/2020 560.4 KB
06-Division 05 8/14/2020 35.0 KB
07-Division 06 8/14/2020 461.1 KB
08-Division 07 8/14/2020 393.1 KB
09-Division 08 8/14/2020 353.0 KB
10-Division 09 8/14/2020 142.8 KB
11-Division 10 8/14/2020 535.6 KB
12-Division 12 8/14/2020 15.8 KB
13-Division 21 8/14/2020 177.8 KB
14-Division 22 8/14/2020 723.7 KB
15-Division 23 8/14/2020 854.5 KB
16-Division 26 8/14/2020 949.3 KB
17-Division 27 8/14/2020 155.2 KB
18-Division 28 8/14/2020 142.5 KB
19-Division 31 8/14/2020 46.8 KB
20-Division 32 8/14/2020 29.2 KB
21-Division 33 8/14/2020 54.4 KB
22-Appendix 8/14/2020 3.0 MB