T2018-01 Construct 60-Man Barracks Bldg

The project includes in the Base Bid, construction of a new 60-soldier barracks building with storm shelter, Alternate No. 1 new concrete paving, Alternate No. 2 new tornado resistant window systems and associated openings in storm shelter exterior building envelope, and Alternate No. 3 new lounge area building.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 8/14/2020 34.0 MB
01-G-001_Cover Sheet 8/14/2020 1.6 MB
02-G-002_Sheet Index and Scope of Work Schedule 8/14/2020 534.3 KB
03-G-101_Code Analysis Plan 8/14/2020 885.8 KB
04-C-101_Existing Site Conditions Plan 8/14/2020 362.1 KB
05-C-102_Site Development Plan 8/14/2020 741.5 KB
06-C-102.1_Site Development Plan Alts 1 and 3 8/14/2020 639.1 KB
07-C103_Site Grading and Erosion Control Plan 8/14/2020 819.7 KB
08-C103.1_Site Grading and Erosion Control Plan Alt 3 8/14/2020 1.9 MB
09-C104_Site Utility Plan Alt 3 8/14/2020 1.1 MB
10-C501_Site Development Details 8/14/2020 408.6 KB
11-C502_Misc Site Details 8/14/2020 718.5 KB
12-S-001_Structural Notes 8/14/2020 757.6 KB
13-S-101_Foundation Plan 8/14/2020 277.8 KB
14-S101.1_Foundation Plan Alt 3 8/14/2020 276.0 KB
15-S102_Interior Masonry Wall Plan 8/14/2020 544.6 KB
16-S-301_Foundation Details 8/14/2020 475.6 KB
17-S-302_Foundation Details Alt 3 8/14/2020 429.1 KB
18-A-101_Floor Plan 8/14/2020 555.6 KB
19-A-101.1_Floor Plan Alt 3 8/14/2020 483.8 KB
20-A-102_Roof Plan 8/14/2020 397.9 KB
21-A-102.1_Roof Plan Alt 3 8/14/2020 394.2 KB
22-A-201_Exterior Elevations 8/14/2020 571.1 KB
23-A-201.1_Exterior Elevations Alt 3 8/14/2020 598.9 KB
24-A-301_Building Sections 8/14/2020 472.8 KB
25-A-401_Wall Sections 8/14/2020 470.2 KB
26-A-402_Wall Sections 8/14/2020 504.7 KB
27-A-403_Wall Sections Alt 3 8/14/2020 478.1 KB
28-A-404_Wall Sections Alt 3 8/14/2020 461.3 KB
29-A-405_Enlarged Plan and Interior Elevations 8/14/2020 714.9 KB
30-A-501_Roofing Details 8/14/2020 833.3 KB
31-A-502_Roofing Details and Misc Details 8/14/2020 700.9 KB
32-A-601_Door and Window Schedules 8/14/2020 509.7 KB
33-A-701_Reflected Ceiling Plan 8/14/2020 577.2 KB
34-A-701.1_Reflected Ceiling Plan Alt 3 8/14/2020 514.7 KB
35-I-101_Interior Finish Plan 8/14/2020 602.5 KB
36-I-101.1_Interior Finish Plan Alt 3 8/14/2020 594.0 KB
37-SE-101_Site Electrical Plan 8/14/2020 709.4 KB
38-SE-101.1_Site Electrical Plan Alt 3 8/14/2020 619.0 KB
39-P-101_Underfloor Plumbing Plan 8/14/2020 1.5 MB
40-P-102_Plumbing Plan 8/14/2020 1.8 MB
41-P-401_Enlarged Plumbing Plan and Schedules 8/14/2020 2.9 MB
42-M-101_HVAC Plan and Schedules 8/14/2020 2.5 MB
43-M-101.1_HVAC Plan Alt 3 8/14/2020 1.5 MB
44-E-101_Lighting Plan 8/14/2020 1.0 MB
45-E-101.1_Lighting Plan Alt 3 8/14/2020 944.7 KB
46-E-102_Power Plan 8/14/2020 1.3 MB
47-E-102.1_Power Plan Alt 3 8/14/2020 1.0 MB
48-E-103_Fire Alarm System Plan 8/14/2020 1.3 MB
49-E-103.1_Fire Alarm System Plan Alt 3 8/14/2020 817.1 KB
50-E-601_Details and Schedules 8/14/2020 2.8 MB