W1901-01 Repair Parking Lot and Loading Dock Infrastructure

The Project consists of general site demolition, ADA sidewalk, curb and gutter, asphalt and concrete pavement, loading dock infrastructure, and improvements to the electrical and water utilities.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 7/21/2021 11.3 MB
01-G-001_Cover Sheet 7/21/2021 1.5 MB
02-CGN-001_General Notes 7/21/2021 4.1 MB
03-CDP-100_Existing Site & Demolition Plan 7/21/2021 1.0 MB
04-CSP-100_Site Plan 7/21/2021 1.5 MB
05-CSP-100A_Site Plan Alternate 7/21/2021 1.5 MB
06-CGP-100_Grading Plan 7/21/2021 1.0 MB
07-CUP-100_Utility Plan 7/21/2021 1.3 MB
08-CD-500_Details 7/21/2021 1.6 MB