W1901-01 Repair Parking Lot and Loading Dock Infrastructure

The Project consists of general site demolition, ADA sidewalk, curb and gutter, asphalt and concrete pavement, loading dock infrastructure, and improvements to the electrical and water utilities.
Addendum #1 (click to expand/collapse)
Name Date Size
W1901-01 Add #1 8/19/2021 434.0 KB