W1901-01 Repair Parking Lot and Loading Dock Infrastructure
The Project consists of general site demolition, ADA sidewalk, curb and gutter, asphalt and concrete pavement, loading dock infrastructure, and improvements to the electrical and water utilities.
Addendum #1
(click to expand/collapse)
Name | Date | Size | ||
W1901-01 Add #1 | 8/19/2021 | 434.0 KB |