W1901-01 Repair Parking Lot and Loading Dock Infrastructure
The Project consists of general site demolition, ADA sidewalk, curb and gutter, asphalt and concrete pavement, loading dock infrastructure, and improvements to the electrical and water utilities.
Specifications
(click to expand/collapse)
Name | Date | Size | ||
01-Full Spec | 7/21/2021 | 31.2 MB | ||
02-Division 00 | 7/21/2021 | 2.9 MB | ||
03-Division 01 | 7/21/2021 | 1.0 MB | ||
04-Division 03 | 7/21/2021 | 401.8 KB | ||
05-Division 04 | 7/21/2021 | 319.9 KB | ||
06-Division 05 | 7/21/2021 | 1.0 MB | ||
07-Division 11 | 7/21/2021 | 261.7 KB | ||
08-Division 31 | 7/21/2021 | 961.8 KB | ||
09-Division 32 | 7/21/2021 | 1.3 MB | ||
10-Division 33 | 7/21/2021 | 381.2 KB | ||
11-Appendices | 7/21/2021 | 23.2 MB |