W1901-01 Repair Parking Lot and Loading Dock Infrastructure

The Project consists of general site demolition, ADA sidewalk, curb and gutter, asphalt and concrete pavement, loading dock infrastructure, and improvements to the electrical and water utilities.
Specifications (click to expand/collapse)
Name Date Size
01-Full Spec 7/21/2021 31.2 MB
02-Division 00 7/21/2021 2.9 MB
03-Division 01 7/21/2021 1.0 MB
04-Division 03 7/21/2021 401.8 KB
05-Division 04 7/21/2021 319.9 KB
06-Division 05 7/21/2021 1.0 MB
07-Division 11 7/21/2021 261.7 KB
08-Division 31 7/21/2021 961.8 KB
09-Division 32 7/21/2021 1.3 MB
10-Division 33 7/21/2021 381.2 KB
11-Appendices 7/21/2021 23.2 MB