T2518-01 Lagoon Repair-Festus Readiness Center

Dewater & clean out the lagoon and install a membrane liner. Verify land application pump station & system in functioning properly. All damaged valves, valve boxes, and sprinklers shall be replaced. Install new plash pads, level gauge, and install rock on lagoon berm.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 5.5 MB
02-Division 00 3.5 MB
03-Division 01 486.2 KB
04-Division 31 230.9 KB
05-Division 32 246.8 KB
06-Division 44 225.3 KB