T2518-01 Lagoon Repair-Festus Readiness Center
Dewater & clean out the lagoon and install a membrane liner. Verify land application pump station & system in functioning properly. All damaged valves, valve boxes, and sprinklers shall be replaced. Install new plash pads, level gauge, and install rock on lagoon berm.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 01-Full Spec | 5.5 MB | ||
| 02-Division 00 | 3.5 MB | ||
| 03-Division 01 | 486.2 KB | ||
| 04-Division 31 | 230.9 KB | ||
| 05-Division 32 | 246.8 KB | ||
| 06-Division 44 | 225.3 KB |