U2309-01 Improvements to Water & Wastewater Systems Infrastructure-St. James Veterans Home
Replacing & realigning the existing waterline, isolation valves, & fire hydrants on site. A portion of the sanitary sewer line is to be replaced & realigned.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 01-Full Spec | 6.1 MB | ||
| 02-Division 00 | 3.3 MB | ||
| 03-Division 01 | 965.0 KB | ||
| 04-Division 03 | 140.2 KB | ||
| 05-Division 05 | 108.8 KB | ||
| 06-Division 07 | 73.1 KB | ||
| 07-Division 08 | 74.2 KB | ||
| 08-Division 09 | 104.2 KB | ||
| 09-Division 10 | 72.7 KB | ||
| 10-Division 31 | 372.8 KB | ||
| 11-Division 32 | 231.6 KB | ||
| 12-Division 33 | 678.2 KB | ||
| 13-Appendix | 599.4 KB |