U2309-01 Improvements to Water & Wastewater Systems Infrastructure-St. James Veterans Home
Replacing & realigning the existing waterline, isolation valves, & fire hydrants on site. A portion of the sanitary sewer line is to be replaced & realigned.
Issued for Bid
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 00-Full PDF of Plans | 51.4 MB | ||
| 01-G-001_Cover Sheet | 377.1 KB | ||
| 02-C-101_Overall Site Plan and Key Sheet | 7.1 MB | ||
| 03-C-102_Waterline Plan Sheet | 4.7 MB | ||
| 04-C-103_Waterline Plan Sheet | 4.4 MB | ||
| 05-C-104_Waterline Plan Sheet | 3.2 MB | ||
| 06-C-105_Waterline Plan Sheet | 4.1 MB | ||
| 07-C-106_Waterline Plan Sheet | 4.7 MB | ||
| 08-C-107_Waterline Plan Sheet | 2.6 MB | ||
| 09-C-108_Sanitary Plan and Profile Sheet | 2.8 MB | ||
| 10-C-501_Civil Details | 1.7 MB | ||
| 11-C-502_Civil Details | 1.7 MB | ||
| 12-C-503_Civil Details | 660.8 KB |