C1903-01 Replace Roofs & Renovate Interior-Western Reception, Diagnostics & Correctional Center

The Work consists of new roofing and associated sheet metal trim at all three buildings, and exterior enclosure modifications, interior finish remodeling, and paving at the Inmate Property Storage Building. The Work includes masonry work, membrane roofing, flashing and sheet metal, windows and glazing, metal doors and frames, overhead sectional door, gypsum drywall, resilient base, epoxy flooring, painting, a new metal canopy and associated mechanical, electrical modifications, and exterior concrete paving.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 12/22/2020 10.7 MB
01-G-001_Cover Sheet 12/22/2020 95.8 KB
02-G-002_Project Information 12/22/2020 537.8 KB
03-G-003_Partition Types 12/22/2020 377.7 KB
04-C101_Site Plan & Details 12/22/2020 578.7 KB
05-D-101_Ground Floor Plan Demolition 12/22/2020 312.9 KB
06-A-101_Ground Floor Plan 12/22/2020 321.2 KB
07-A-102_Mezzanine Floor Plan & Misc Details 12/22/2020 663.0 KB
08-A-103_Roof Plans 12/22/2020 293.8 KB
09-A-201_Building Elevations North & West 12/22/2020 301.4 KB
10-A-202_Building Elevations South & East 12/22/2020 298.2 KB
11-A-203_Building Elevations Repointing 12/22/2020 312.9 KB
12-A-301_Building Sections 12/22/2020 447.0 KB
13-A-501_Exterior Roof Details 12/22/2020 380.2 KB
14-A-601_Door Window & Room Finish Schedules 12/22/2020 347.3 KB
15-A-701_Ground Floor Plan Reflected Ceiling 12/22/2020 340.0 KB
16-A-801_Existing Building Photographs 12/22/2020 6.0 MB
17-H-101_Inmate Prop St Bldg Asbestos Containing Materials 12/22/2020 311.4 KB
18-H-102_Laundry Building Asbestos Containing Materials 12/22/2020 115.7 KB
19-DMP10.00_Floor Plan Mech Plumb Demo 12/22/2020 885.5 KB
20-MP10.01_Floor Plan Mech Plumb New Work 12/22/2020 1.0 MB
21-MP11.00_Mech Plumb Schedules 12/22/2020 717.3 KB
22-MP11.01_Mech Plumb Details General Notes & Symbols 12/22/2020 606.7 KB
23-DE10.00_Floor Plan Elect Demo 12/22/2020 921.8 KB
24-E10.014_Floor Plan Power 12/22/2020 935.5 KB
25-E10.11_Floor Plan Lighting 12/22/2020 922.2 KB
26-E11.00_Elect Details & Schedules 12/22/2020 592.5 KB
27-E11.01_Elect Schedules General Notes & Symbols 12/22/2020 592.1 KB