C1903-01 Replace Roofs & Renovate Interior-Western Reception, Diagnostics & Correctional Center
The Work consists of new roofing and associated sheet metal trim at all three buildings, and exterior enclosure modifications, interior finish remodeling, and paving at the Inmate Property Storage Building. The Work includes masonry work, membrane roofing, flashing and sheet metal, windows and glazing, metal doors and frames, overhead sectional door, gypsum drywall, resilient base, epoxy flooring, painting, a new metal canopy and associated mechanical, electrical modifications, and exterior concrete paving.
Specifications
(click to expand/collapse)
Name | Date | Size | ||
01-Full Spec | 12/22/2020 | 14.1 MB | ||
02-Division 00 | 12/22/2020 | 2.9 MB | ||
03-Division 01 | 12/22/2020 | 1.0 MB | ||
04-Division 02 | 12/22/2020 | 5.3 MB | ||
05-Division 03 | 12/22/2020 | 249.8 KB | ||
06-Division 04 | 12/22/2020 | 252.3 KB | ||
07-Division 05 | 12/22/2020 | 150.0 KB | ||
08-Division 06 | 12/22/2020 | 146.7 KB | ||
09-Division 07 | 12/22/2020 | 395.7 KB | ||
10-Division 08 | 12/22/2020 | 528.8 KB | ||
11-Division 09 | 12/22/2020 | 311.8 KB | ||
12-Division 10 | 12/22/2020 | 268.8 KB | ||
13-Division 22 | 12/22/2020 | 634.4 KB | ||
14-Division 23 | 12/22/2020 | 1.1 MB | ||
15-Division 26 | 12/22/2020 | 553.5 KB | ||
16-Division 28 | 12/22/2020 | 96.3 KB | ||
17-Division 31 | 12/22/2020 | 63.8 KB | ||
18-Division 32 | 12/22/2020 | 167.9 KB | ||
19-Division 33 | 12/22/2020 | 583.0 KB |