O1805-01 / Replace Rooftop Units-North County Service Center
The project includes base bid work is the removal and replacement of two existing packaged rooftop units with direct expansion (DX) cooling and gas-fired heating with new in kind packaged rooftop units. Replace the control actuators and thermostats for all existing-to-remain variable air volume (VAV) and fan terminal unit (FTU) HVAV boxes in the building. Replace the existing KMC thermostatic control/automation system with new BACnet compatible building automation system. The Alternate #1 work includes removal and replacement of two existing IT Room split-system indoor ducted fan-coil units and rooftop AC condensing units. The contractor must provide temporary/supplemental cooling of the It Room (during construction cooling outage) to prevent NCSS building State Agency’s server equipment from overheating.
Specifications
(click to expand/collapse)
Name | Date | Size | ||
00-Very Important MissouriBUYS Instructions Revised 09-09-20 | 10/21/2020 | 1.3 MB | ||
01-Invitation for Bidders and addendum language | 10/21/2020 | 103.2 KB | ||
02-Full Spec | 10/21/2020 | 6.7 MB | ||
03-Division 00 | 10/21/2020 | 2.9 MB | ||
04-Division 01 | 10/21/2020 | 891.5 KB | ||
05-Division 23 | 10/21/2020 | 1.8 MB | ||
06-Division 26 | 10/21/2020 | 620.7 KB | ||
07-Appendix | 10/21/2020 | 1.2 MB |