O1805-01 / Replace Rooftop Units-North County Service Center

The project includes base bid work is the removal and replacement of two existing packaged rooftop units with direct expansion (DX) cooling and gas-fired heating with new in kind packaged rooftop units. Replace the control actuators and thermostats for all existing-to-remain variable air volume (VAV) and fan terminal unit (FTU) HVAV boxes in the building. Replace the existing KMC thermostatic control/automation system with new BACnet compatible building automation system. The Alternate #1 work includes removal and replacement of two existing IT Room split-system indoor ducted fan-coil units and rooftop AC condensing units. The contractor must provide temporary/supplemental cooling of the It Room (during construction cooling outage) to prevent NCSS building State Agency’s server equipment from overheating.
Specifications (click to expand/collapse)
Name Date Size
00-Very Important MissouriBUYS Instructions Revised 09-09-20 10/21/2020 1.3 MB
01-Invitation for Bidders and addendum language 10/21/2020 103.2 KB
02-Full Spec 10/21/2020 6.7 MB
03-Division 00 10/21/2020 2.9 MB
04-Division 01 10/21/2020 891.5 KB
05-Division 23 10/21/2020 1.8 MB
06-Division 26 10/21/2020 620.7 KB
07-Appendix 10/21/2020 1.2 MB