U2002-01 Replace HVAC System, Administration Building-Bloomfield Veterans Cemetery

The project includes replacing 7 water-source heat pumps with 5 water-source heat pumps & all ductwork modifications required to combine systems. A water to water heat pump will also be replaced as well as associated radiant floor pump, circulators & pipe. Pipe embedded in the radiant floor is not being replaced.
Addendum #1 (click to expand/collapse)
Name Size
U2002-01 Add #1 474.7 KB