U2002-01 Replace HVAC System, Administration Building-Bloomfield Veterans Cemetery

The project includes replacing 7 water-source heat pumps with 5 water-source heat pumps & all ductwork modifications required to combine systems. A water to water heat pump will also be replaced as well as associated radiant floor pump, circulators & pipe. Pipe embedded in the radiant floor is not being replaced.
Specifications (click to expand/collapse)
Name Date Size
01-Full Spec 8/15/2022 3.0 MB
02-Division 00 8/15/2022 2.5 MB
03-Division 01 8/15/2022 494.4 KB
04-Division 23 8/15/2022 410.2 KB
05-Division 26 8/15/2022 254.1 KB