C1806-01 Wastewater Treatment Facility Improvements

The project consists of providing & installation of a flow control structure, Triplepoint NitrOx equipment, blowers, UV disinfection, flow metering, interconnecting piping, structures, electrical equipment, appurtenances as necessary and as shown on the plans.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 6/14/2022 19.6 MB
01-G-001_Cover Sheet 6/14/2022 463.5 KB
02-G-002_General Notes 6/14/2022 489.2 KB
03-G-003_Location Map 6/14/2022 1.2 MB
04-G-004_Process Flow Diagram 6/14/2022 466.4 KB
05-G-005_Hydraulic Profile 6/14/2022 879.8 KB
06-G-006_Project Abbreviations 6/14/2022 477.2 KB
07-C-101_Existing Conditions Plan 6/14/2022 1.0 MB
08-C-102_Demo Plan 6/14/2022 852.8 KB
09-C-103_Site Plan Overall 6/14/2022 1.2 MB
10-C-104_Site Plan Headworks Bldg 6/14/2022 506.0 KB
11-C-105_Site Plan Triplepoint Equipment 6/14/2022 872.2 KB
12-C-106_Site Plan UV and Flow Meter 6/14/2022 523.1 KB
13-C-107_Site Plan Aeration Plan 6/14/2022 1.5 MB
14-C-108_Site Plan Lagoon Berm Repair 6/14/2022 1.1 MB
15-C-109_Site Grading and Erosion Control Plan West Area 6/14/2022 646.9 KB
16-C-110_Site Grading and Erosion Control Plan East Area 1 6/14/2022 1.1 MB
17-C-111_Site Grading and Erosion Control Plan East Area 2 6/14/2022 761.7 KB
18-C-112_Sanitary Sewer Plan and Profile 6/14/2022 864.0 KB
19-C-113_Sanitary Sewer Plan and Profile 6/14/2022 626.0 KB
20-C-501_Civil Details 6/14/2022 403.6 KB
21-C-502_Civil Details 6/14/2022 522.9 KB
22-C-503_Civil Details 6/14/2022 517.5 KB
23-C-504_Erosion Control Details 6/14/2022 566.2 KB
24-S-001_Structural Notes 6/14/2022 353.6 KB
25-S-101_Triplepoint Tank Structural Plans 6/14/2022 446.5 KB
26-S-102_Blower Pad Structural Plan 6/14/2022 663.0 KB
27-S-103_UV Pad Structural Plan 6/14/2022 602.5 KB
28-S-501_Structural Details 6/14/2022 535.1 KB
29-D-001_Symbols 6/14/2022 482.2 KB
30-D-002_Symbols 6/14/2022 465.0 KB
31-D-003_Pipe System Codes and Equipment Abbrevs 6/14/2022 466.3 KB
32-D-101_Flow Control Structure Plan 6/14/2022 499.0 KB
33-D-102_Triplepoint Tank Plan and Sections 6/14/2022 1.2 MB
34-D-103_Blower Plan and Sections 6/14/2022 749.8 KB
35-D-104_UV Plan and Section 6/14/2022 565.5 KB
36-D-105_Flow Meter Washdown MHS Plan and Section 6/14/2022 611.7 KB
37-D-501_Process Details 6/14/2022 583.4 KB
38-D-601_IO Schedules 6/14/2022 621.3 KB
39-E-001_Symbols Legend and Abbrevs 6/14/2022 351.6 KB
40-E-101_Site Demo Plan 6/14/2022 631.0 KB
41-E-102_Site Improvement Plan 6/14/2022 1.2 MB
42-E-103_Triplepoint System Plan 6/14/2022 1.1 MB
43-E-104_UV System Plan 6/14/2022 394.1 KB
44-E-105_Flow Meter Plan 6/14/2022 396.5 KB
45-E-401_Riser Diagrams 6/14/2022 386.2 KB
46-E-501_Schedules and Details 6/14/2022 2.0 MB
47-1_Tavistock Aerator Installation Typical 6/14/2022 238.1 KB
48-2_Typical Installation Arrangement 6/14/2022 242.2 KB