C1806-01 Wastewater Treatment Facility Improvements

The project consists of providing & installation of a flow control structure, Triplepoint NitrOx equipment, blowers, UV disinfection, flow metering, interconnecting piping, structures, electrical equipment, appurtenances as necessary and as shown on the plans.
Specifications (click to expand/collapse)
Name Date Size
01-Full Spec 6/14/2022 23.9 MB
02-Division 00 6/14/2022 3.1 MB
03-Division 01 6/14/2022 1.1 MB
04-Division 02 6/14/2022 100.0 KB
05-Division 03 6/14/2022 242.5 KB
06-Division 05 6/14/2022 175.5 KB
07-Division 09 6/14/2022 208.9 KB
08-Division 26 6/14/2022 417.3 KB
09-Division 31 6/14/2022 167.8 KB
10-Division 32 6/14/2022 115.0 KB
11-Division 33 6/14/2022 160.8 KB
12-Division 40 6/14/2022 386.8 KB
13-Division 44 6/14/2022 126.2 KB
14-Division 46 6/14/2022 158.2 KB
15-Appendices 6/14/2022 19.3 MB