O22A2-01 3rd Floor Renovation Employment Security Central Office (DOLIR)
The Project consists of the renovation of the office spaces on the 3rd floor of the Employment Security Central Office Building, including: selective demolition, interior partition construction, carpet and resilient flooring, interior door and frame installation, finish carpentry, interior painting, acoustical ceiling system modification, plumbing, electrical and rough-in work for communication/data wiring. There are three alternates listed below: Alternate 1: Provide Formica 3466-RD Antique Mascarello Radiance® finish plastic laminate (or approved equal) for plastic laminated countertops in lieu of Formica 3466-11 Antique Mascarello SatinTouch™ finish plastic laminate. Alternate 2: Install pre-finished storefront glazing system (fixed windows) in interior partition between two conference rooms and large multi-purpose room (as shown on plans) in lieu of complete interior partition. Alternate 3: Install electrical duplex outlet and rough-in work for communication/data wiring at alternative location in two adjacent conference rooms. Alternate 4: Install hollow metal frame and double hollow metal doors – and associated hardware – at Multi-Purpose room in lieu of cased opening.
Specifications
(click to expand/collapse)
Name | Date | Size | ||
01-Full Spec | 6/1/2022 | 9.5 MB | ||
02-Division 00 | 6/1/2022 | 2.1 MB | ||
03-Division 01 | 6/1/2022 | 1.7 MB | ||
04-Division 02 | 6/1/2022 | 228.8 KB | ||
05-Division 06 | 6/1/2022 | 451.7 KB | ||
06-Division 07 | 6/1/2022 | 501.8 KB | ||
07-Division 08 | 6/1/2022 | 836.6 KB | ||
08-Division 09 | 6/1/2022 | 1.0 MB | ||
09-Division 22 | 6/1/2022 | 1.2 MB | ||
10-Division 23 | 6/1/2022 | 116.2 KB | ||
11-Division 26 | 6/1/2022 | 1.2 MB | ||
12-Division 27 | 6/1/2022 | 259.7 KB |