X2117-02 Paved Trail Repair Ph 2 - Weston Bend State Park
Relocation and/or grade reduction of trail sections with excessive slope grades. Project also includes patching & repaving the old section of trail that will be utilized as access for the construction of the rerouted areas.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 01-Full Spec | 9.2 MB | ||
| 02-Division 00 | 2.0 MB | ||
| 03-Division 01 | 1.5 MB | ||
| 04-Division 03 | 333.0 KB | ||
| 05-Division 06 | 116.7 KB | ||
| 06-Division 31 | 812.6 KB | ||
| 07-Division 32 | 373.2 KB | ||
| 08-Division 33 | 479.4 KB | ||
| 09-Appendix | 4.1 MB |