R2517-01 Update HVAC & Chiller-Crime Lab Building-Troop D Crime Lab
Replacement of the existing chilled water system, air handling unit, VAV terminal units, and mini-split systems. In addition, a second chiller will be installed to provide redundancy.
Addendum #1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| R2517-01 Add #1 | 5.2 MB |
Addendum #2
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| R2517-01 Add #2 Plans & Specs | 1.3 MB |