O2427-01 Repl Multi Electronic Systems-George Washington Carver State Office Building
Demolition of existing fire alarm system, installation of new fire alarm system, startup & testing, and integration with owner's central monitoring service.
Issued for Bid
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 00-Full PDF of Plans | 20.6 MB | ||
| 01-G001_Title Sheet | 546.3 KB | ||
| 02-G002_Index Page | 3.4 MB | ||
| 03-FA100_Fire Alarm Plans - Basement | 3.1 MB | ||
| 04-FA101_Fire Alarm Plans - Level 1 | 3.2 MB | ||
| 05-FA102_Fire Alarm Plans - Level 2 | 3.2 MB | ||
| 06-FA103_Fire Alarm Plans - Level 3 | 3.2 MB | ||
| 07-FA111_Fire Alarm Plans - Warehouse | 3.2 MB | ||
| 08-FA500_Fire Alarm Details | 6.2 MB |