E2329-01 Foundation Stabilization & Waterproofing E.W. Thompson State School
The project consists of underpinning of existing strip & spread footings including excavation to bottom of footings, preparation & footings to receive underpinning and backfill. Also includes removal & replacement of exterior sidewalks & paving & interior slabs-on-grade along with the removal & replacement or reinstallation of interior floor finishes as part of the underpinning work. The interior faces of the perimeter CMU walls are to be re-pointed where cracks are present. All openings are to be re-caulked.
Issued for Bid
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 00-Full PDF of Plans | 4.4 MB | ||
| 01-Cover_Cover Sheet | 401.5 KB | ||
| 02-S-000_Site Location | 490.0 KB | ||
| 03-S-001_General Notes | 3.0 MB | ||
| 04-S-100_Foundation Floor Plan | 609.9 KB | ||
| 05-S-101_First Floor Plan | 705.2 KB | ||
| 06-S-102_Alternate 2 Interior Wall Painting Plan | 560.1 KB | ||
| 07-S-200_North Elevation | 514.2 KB | ||
| 08-S-201_West Elevation | 528.0 KB | ||
| 09-S-202_South Elevation | 514.9 KB | ||
| 10-S-203_East Elevation | 535.8 KB | ||
| 11-S-204_Photos | 438.7 KB | ||
| 12-S-205_Alternate 1 North Elevation | 483.2 KB | ||
| 13-S-206_Alternate 1 West Elevation | 483.0 KB | ||
| 14-S-207_Alternate 1 South Elevation | 481.1 KB | ||
| 15-S-208_Alternate 1 East Elevation | 485.2 KB | ||
| 16-S-300_Rapair Details | 495.7 KB | ||
| 17-S-301_Foundation Details | 537.4 KB | ||
| 18-S-400_Wall Repair Details | 479.8 KB |