O2020-01 HVAC Modifications - Joseph P. Teasdale State Office Building
Replacing the boiler, heating water pumps, supply fan, heating & cooling coils, & extending BAS for the new equipment.
| Filetype Icon | Name | Size |
|---|---|---|
| 15.8 MB | ||
| 5.5 MB | ||
| 2.8 MB | ||
| 2.2 MB | ||
| 5.8 MB | ||
| 2.8 MB |