T2218-01 Auditorium Renovation-Ike Skelton Training Site
The Project consists of the interior renovation of the Ike Skelton Training Site Auditorium and Sound Booth. The renovation will include the removal and replacement of the ceiling, new LED lighting and AV sound / projection equipment, painting of the walls in the auditorium and sound booth, replacement of the flooring and installing new seating. It will also include minor HVAC removal and replacement along with adding an ADA chair lift to access the upper level of the stage.
Specifications
(click to expand/collapse)
Name | Size | ||
01-Full Spec | 4.5 MB | ||
02-Division 00 | 3.3 MB | ||
03-Division 01 | 514.1 KB | ||
04-Division 09 | 849.4 KB | ||
05-Division 11 | 115.3 KB | ||
06-Division 12 | 624.8 KB | ||
07-Division 14 | 570.3 KB | ||
08-Division 23 | 89.0 KB | ||
09-Division 26 | 125.8 KB | ||
10-Division 27 | 401.3 KB | ||
11-Appendix | 199.4 KB |