C2014-01 Upgrade HVAC & BAS-Community Supervision Center-Farmington
The project includes replacing 3 existing condensing units along with associated DX coils. A new chiller shall be installed with associated chilled water system. New chilled water coils shall be installed in existing air handling units. The existing BAS shall be upgraded.
Issued for Bid
(click to expand/collapse)
Name | Size | ||
00-Full PDF of Plans | 2.8 MB | ||
01-G-000_Cover Sheet | 204.6 KB | ||
02-M-001_Symbols and Legend | 191.2 KB | ||
03-MD-101_Demolition | 254.5 KB | ||
04-M-201_Floor Plan | 255.4 KB | ||
05-M-401_Enlarged Plan | 196.6 KB | ||
06-M-501_Details | 209.8 KB | ||
07-M-502_Chilled Water Schematic | 163.2 KB | ||
08-M-601_Schedules | 143.9 KB | ||
09-M-701_Controls | 240.1 KB | ||
10-E-001_Symbols and Legend | 305.7 KB | ||
11-ED-101_Enlarged Demolition | 528.3 KB | ||
12-ED-201_Enlarged Demolition | 394.1 KB | ||
13-E-101_Enlarged Plans | 355.6 KB |