T2213-01 Utility Infrastructure Improvements-Wappapello Training Site
The project includes site infrastructure improvements consisting of electric, communications, domestic water, sanitary sewer, fire suppression water storage, pumping & distribution.
Issued for Bid
(click to expand/collapse)
(click to expand/collapse)
| Name | Date | Size | ||
| 00-Full PDF of Plans | 8/3/2022 | 38.5 MB | ||
| 01-G001_Cover Sheet | 8/3/2022 | 1.2 MB | ||
| 02-C001_General Notes & Legends | 8/3/2022 | 5.9 MB | ||
| 03-CD101_Demo & Grading Plan | 8/3/2022 | 3.3 MB | ||
| 04-C101_Site Utility Plan | 8/3/2022 | 3.6 MB | ||
| 05-C102_Utility Plan & Profiles | 8/3/2022 | 4.5 MB | ||
| 06-C103_Pump House Drain & OWS Separator Details | 8/3/2022 | 3.5 MB | ||
| 07-C104_Fire Suppression Tank Details | 8/3/2022 | 2.3 MB | ||
| 08-C501_Miscellaneous Details | 8/3/2022 | 4.2 MB | ||
| 09-C502_Miscellaneous Details Continued | 8/3/2022 | 3.4 MB | ||
| 10-S001_Structural Notes | 8/3/2022 | 2.7 MB | ||
| 11-S101_Foundation Plan & Details | 8/3/2022 | 714.8 KB | ||
| 12-S201_Framing Plan | 8/3/2022 | 367.2 KB | ||
| 13-S301_Framing Elevations | 8/3/2022 | 484.3 KB | ||
| 14-M100_Fire Pump Plan | 8/3/2022 | 1.6 MB | ||
| 15-M200_Heating & Ventilation Plan | 8/3/2022 | 622.7 KB | ||
| 16-E100_Electrical Plan | 8/3/2022 | 2.1 MB | ||
| 17-E200_Electrical Schedues & Details | 8/3/2022 | 1.8 MB |