Y2202-01 Franklin Reclamation Project
The Land Reclamation Program, Department of Natural Resources, State of Missouri, intends to complete coal mine reclamation activities, including: installation of 2-inch (2”) rock, MoDOT Type 3 Ditch Liner, excavating mine spoil piles; backfilling mine pits; reinforcing earthen dams; replacing corrugated metal pipe culvert and grade all work areas and other related work, all in accordance with the enclosed plans and specifications. The work also includes Alternate No. 1 which includes water treatment, fertilizer, seed and mulch. Please refer to plans and specifications and Section 012300 Alternates for further details.
Issued for Bid
(click to expand/collapse)
(click to expand/collapse)
| Name | Date | Size | ||
| 00-Full PDF of Plans | 5/18/2022 | 8.8 MB | ||
| 01-G-100_Cover Sheet | 5/18/2022 | 738.2 KB | ||
| 02-G-101_Project Areas With Aerial Imagery | 5/18/2022 | 1.2 MB | ||
| 03-G-102_Existing Conditions Areas 1-5 | 5/18/2022 | 2.6 MB | ||
| 04-C-100_Plan View Area 1 | 5/18/2022 | 1.8 MB | ||
| 05-C-101_Plan View Area 2 | 5/18/2022 | 1.8 MB | ||
| 06-C-102_Plan View Area 3 | 5/18/2022 | 1.7 MB | ||
| 07-C-103_Plan View Area 4&5 | 5/18/2022 | 1.4 MB | ||
| 08-C-104_Cross Sections | 5/18/2022 | 405.7 KB | ||
| 09-C-105_Cross Sections | 5/18/2022 | 409.1 KB | ||
| 10-C-106_Cross Sections | 5/18/2022 | 421.3 KB | ||
| 11-C-107_Cross Sections | 5/18/2022 | 546.2 KB | ||
| 12-D-100_Details | 5/18/2022 | 405.0 KB |