R2013-01 CHANGE IN SCOPE REBID Repair Building Exterior Troop B Headquarters & Crime Lab
The project includes pavement removal, pavement reconstruction, minor grading, lead paint abatement, exterior painting, tuck-pointing, concrete stair removal & replacement, pavement markings, sidewalk removal & replacement, final seeding & mulching.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Date | Size | ||
| 01-Full Spec | 3/22/2022 | 11.4 MB | ||
| 02-Division 00 | 3/22/2022 | 3.5 MB | ||
| 03-Division 01 | 3/22/2022 | 1.8 MB | ||
| 04-Division 02 | 3/22/2022 | 862.7 KB | ||
| 05-Division 03 | 3/22/2022 | 1.0 MB | ||
| 06-Division 04 | 3/22/2022 | 850.7 KB | ||
| 07-Division 05 | 3/22/2022 | 25.9 KB | ||
| 08-Division 07 | 3/22/2022 | 607.9 KB | ||
| 09-Division 09 | 3/22/2022 | 699.2 KB | ||
| 10-Division 31 | 3/22/2022 | 840.7 KB | ||
| 11-Division 32 | 3/22/2022 | 1.1 MB | ||
| 12-Appendix 1 | 3/22/2022 | 3.8 MB | ||
| 13-Appendix 2 | 3/22/2022 | 2.1 MB |