M2002-01 Repl HVAC System & Controls-Higginsville Habilitation Center
Replacing the existing HVAC system & controls with two new roof top units & two new furnaces. An instantaneous hot water heater will proide domestic hot water. A new supply fan with an electric duct heater will provide makeup air to the dryers.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Date | Size | ||
| 01-Full Spec | 12/23/2021 | 9.7 MB | ||
| 02-Division 00 | 12/23/2021 | 3.6 MB | ||
| 03-Division 01 | 12/23/2021 | 1.3 MB | ||
| 04-Division 02 | 12/23/2021 | 702.0 KB | ||
| 05-Division 22 | 12/23/2021 | 358.1 KB | ||
| 06-Division 23 | 12/23/2021 | 924.5 KB | ||
| 07-Division 26 | 12/23/2021 | 775.9 KB | ||
| 08-Appendix | 12/23/2021 | 2.7 MB |