O2115-01 State of Missouri Public Health Laboratory Renovation
The project includes the renovation of selective laboratory spaces within the first floor Biosafety Level 3 (BSL-3) & third floor (non BSL-3) environments. the spaces will receive new ceilings, new flooring, power & data cabling, and will be reconfigured with new modular laboratory work tables. the facility will remain fully operational during the extent of the renovation work.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Date | Size | ||
| 01-Ful Spec | 8/12/2021 | 7.5 MB | ||
| 02-Division 00 | 8/12/2021 | 2.6 MB | ||
| 03-Division 01 | 8/12/2021 | 750.8 KB | ||
| 04-Division 02 | 8/12/2021 | 45.9 KB | ||
| 05-Division 04 | 8/12/2021 | 82.1 KB | ||
| 06-Division 05 | 8/12/2021 | 65.4 KB | ||
| 07-Division 06 | 8/12/2021 | 87.7 KB | ||
| 08-Division 07 | 8/12/2021 | 80.3 KB | ||
| 09-Division 08 | 8/12/2021 | 315.3 KB | ||
| 10-Division 09 | 8/12/2021 | 280.4 KB | ||
| 11-Division 10 | 8/12/2021 | 75.7 KB | ||
| 12-Division 12 | 8/12/2021 | 102.7 KB | ||
| 13-Division 21 | 8/12/2021 | 346.1 KB | ||
| 14-Division 22 | 8/12/2021 | 572.0 KB | ||
| 15-Division 23 | 8/12/2021 | 1.0 MB | ||
| 16-Division 26 | 8/12/2021 | 562.2 KB | ||
| 17-Division 27 | 8/12/2021 | 277.0 KB | ||
| 18-Division 28 | 8/12/2021 | 189.3 KB |