OLD-X2101-01 First Missouri State Capitol State Historic Site Sidewalk & Drainage Improvements
The project consists of replacement of the flagstone sidewalk with a new sidewalk that facilitates pedestrian activities and site visitation, meets ADA requirements, incorporates improvements to the site interpretive center entrance, and conveys storm water away from the historic structure.
Issued for Bid
(click to expand/collapse)
Name | Date | Size | ||
00-Full PDF of Plans | 5/14/2021 | 6.2 MB | ||
01-G-000_Cover Sheet | 5/14/2021 | 338.2 KB | ||
02-G-001_Existing Site Survey | 5/14/2021 | 914.4 KB | ||
03-L-001_Notes & Legends | 5/14/2021 | 451.1 KB | ||
04-L-100_Temporary Traffic Control Plan | 5/14/2021 | 410.0 KB | ||
05-L-110_Demoltion Plan Base Bid | 5/14/2021 | 366.3 KB | ||
06-L-111_Materials Plan Base Bid | 5/14/2021 | 831.2 KB | ||
07-L-112_Grading & Drainage Plan Base Bid | 5/14/2021 | 796.7 KB | ||
08-L-113_Lighting Plan Base Bid | 5/14/2021 | 2.3 MB | ||
09-L-120_Demolition Plan Alt 1 | 5/14/2021 | 372.6 KB | ||
10-L-121_Materials Plan Alt 1 | 5/14/2021 | 845.7 KB | ||
11-L-122_Grading & Drainage Plan Alt 1 | 5/14/2021 | 810.3 KB | ||
12-L-123_Tree Planting Plan Alt 1 | 5/14/2021 | 774.2 KB | ||
13-L-510_Details | 5/14/2021 | 497.2 KB |