T1932-01 Construct Expansion and Replace Standing Seam Roof-FMS-Festus
The project includes removal of and installation of a new insulated standing seam metal roof over the original pre-engineered metal building; and construction of a new unheated pre-engineered metal storage building that contains an enclosed automotive battery storage and charging room.
Issued for Bid
(click to expand/collapse)
Name | Date | Size | ||
00-Full PDF of Plans | 7/30/2020 | 21.0 MB | ||
01-G-001_Cover Sheet | 7/30/2020 | 321.2 KB | ||
02-G-002_General Information | 7/30/2020 | 1.2 MB | ||
03-A-100_Survey Site Plan | 7/30/2020 | 540.9 KB | ||
04-A-101_Floor Plan Demo New | 7/30/2020 | 532.8 KB | ||
05-A-102_Roof Plan Exist Demo New | 7/30/2020 | 530.4 KB | ||
06-A-201_Building elevations | 7/30/2020 | 436.9 KB | ||
07-A-501_Details | 7/30/2020 | 645.3 KB | ||
08-A-502_Details Schedules | 7/30/2020 | 563.6 KB | ||
09-A-S01_General Notes | 7/30/2020 | 814.4 KB | ||
10-S-102_Typical Details | 7/30/2020 | 730.2 KB | ||
11-S-201_Foundation Plan | 7/30/2020 | 4.2 MB | ||
12-S-301_Sections & Details | 7/30/2020 | 5.5 MB | ||
13-S-302_Sections & Details | 7/30/2020 | 2.4 MB | ||
14-MP101_HVAC Plumbing Floor Plan | 7/30/2020 | 3.2 MB | ||
15-E-101_Floor Plan Electrical | 7/30/2020 | 1.1 MB |