T1922-01 Install Solar Array and FMS Battery Storage
The project includes installation of Solar Arrays at multiple buildings, and an FMS Battery Storage Building at the Camp Crowder Training Site, Neosho MO.
Addendum #1
(click to expand/collapse)
Name | Date | Size | ||
09-E-001_Electrical Solar Array Building List Legend and Notes Add #1 | 5/20/2020 | 563.9 KB | ||
T1922-01 Add #1 Spec | 5/20/2020 | 327.0 KB |
Addendum #2
(click to expand/collapse)
Name | Date | Size | ||
T1922-01 Add #2 | 5/27/2020 | 579.3 KB |