E2329-01 Foundation Stabilization & Waterproofing E.W. Thompson State School

The project consists of underpinning of existing strip & spread footings including excavation to bottom of footings, preparation & footings to receive underpinning and backfill. Also includes removal & replacement of exterior sidewalks & paving & interior slabs-on-grade along with the removal & replacement or reinstallation of interior floor finishes as part of the underpinning work. The interior faces of the perimeter CMU walls are to be re-pointed where cracks are present. All openings are to be re-caulked.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 6.5 MB
02-Division 00 2.0 MB
03-Division 01 1.4 MB
04-Division 02 136.1 KB
05-Division 03 228.5 KB
06-Division 04 123.0 KB
07-Division 07 99.8 KB
08-Division 09 91.7 KB
09-Division 31 224.8 KB
10-Division 32 85.4 KB
11-Appendix 1 2.1 MB