E2329-01 Foundation Stabilization & Waterproofing E.W. Thompson State School

The project consists of underpinning of existing strip & spread footings including excavation to bottom of footings, preparation & footings to receive underpinning and backfill. Also includes removal & replacement of exterior sidewalks & paving & interior slabs-on-grade along with the removal & replacement or reinstallation of interior floor finishes as part of the underpinning work. The interior faces of the perimeter CMU walls are to be re-pointed where cracks are present. All openings are to be re-caulked.
Issued for Bid (click to expand/collapse)