R2314-01 Second Fl Annex HVAC Unit Repl-MSHP General Hdq

Replacement of the existing air handling unit & boiler serving the hot water system for the MSHP GHQ, Annex Building. The third floor will require newly installed ductwork & new mixing boxes. In addition, new controls for the AHU, mixing boxes, & the boiler are required.
Addendum #1 (click to expand/collapse)
Name Size
R2314-01 Addendum #1 52.3 KB
Addendum #2 (click to expand/collapse)
Name Size
R2314-01 Add #2 930.3 KB