C2010-01 Replace BAS & HVAC System-Supervision Center Bldg-Community Supervision Center

The project includes replacing 3 existing condensing units along with associated DX coils. A new chiller shall be installed with associated chiller water system. New chilled water coils shall be installed in existing air handling units. The existing BAS shall be upgraded.
Addendum #1 (click to expand/collapse)
Name Size
C2010-01 Add #1 939.8 KB