C2001-01 Replace Kitchen Flooring (3rd Floor) Western Reception Diagnostic Correctional Center

The project includes removing the existing kitchen flooring, installing new floor sinks, plumbing piping, repair the floor drains to correct an issue with water filtration, and installation of the new floor tiling.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 4.1 MB
02-Division 00 3.2 MB
03-Division 01 933.9 KB
04-Division 02 70.2 KB
05-Division 03 99.6 KB
06-Division 07 650.2 KB
07-Division 09 70.9 KB
08-Division 22 1.0 MB