RE-BID M2001-01 Install Fire Alarm System-Northwest Missouri Psychiatric Rehabilitation Center

The work consists of providing a complete fire-alarm system replacement of devices & panels, by swapping out existing devices & panels for new at all current locations (when applicable) & providing new devices at new locations to provide a code compliant system in the Main Facility & the six cottages. Existing wiring & conduit is intended for reuse, & is assumed in good condition by this design. New wiring will be required for relocated devices & additional devices.
Specifications (click to expand/collapse)
Name Date Size
01-Full Spec 9/29/2022 3.3 MB
02-Division 00 9/29/2022 2.3 MB
03-Division 01 9/29/2022 1.0 MB
04-Division 02 9/29/2022 34.0 KB
05-Division 28 9/29/2022 220.5 KB