O2002-01 Parking Lot Rehabilitation Roberts State Office Building

The project includes replacing the existing parking lot, replacing the existing sidewalk & ensuring ADA compliance, improving drainage through storm sewer replacements & the addition of a gutter, final seeding and cover.
Issued for Bid (click to expand/collapse)
Name Date Size
00-Full PDF of Plans 8/24/2021 12.5 MB
01-G-001_Cover Sheet 8/24/2021 142.3 KB
02-G-002_General Notes 8/24/2021 258.1 KB
03-C-001_Base Bid & Alternate Layout 8/24/2021 2.4 MB
04-C-002_Project Control & Demolition Plan 8/24/2021 2.6 MB
05-C-101_Site Plan 8/24/2021 2.4 MB
06-C-102_Grading Plan 8/24/2021 803.5 KB
07-C-103_Grading Plan 8/24/2021 265.1 KB
08-C-104_Joint Plan 8/24/2021 627.3 KB
09-C-501_Details 8/24/2021 340.4 KB
10-C-502_Details 8/24/2021 710.7 KB
11-C-503_Details 8/24/2021 2.7 MB
12-C-801_Phasing Plan 8/24/2021 705.5 KB
13-C-802_Alternate No 1 Phase 5 8/24/2021 388.5 KB
14-C-803_Erosion Control Plan 8/24/2021 1.5 MB
15-Traffic Control Plan 8/24/2021 1.9 MB