O2002-01 Parking Lot Rehabilitation Roberts State Office Building
The project includes replacing the existing parking lot, replacing the existing sidewalk & ensuring ADA compliance, improving drainage through storm sewer replacements & the addition of a gutter, final seeding and cover.
Issued for Bid
(click to expand/collapse)
(click to expand/collapse)
| Name | Date | Size | ||
| 00-Full PDF of Plans | 8/24/2021 | 12.5 MB | ||
| 01-G-001_Cover Sheet | 8/24/2021 | 142.3 KB | ||
| 02-G-002_General Notes | 8/24/2021 | 258.1 KB | ||
| 03-C-001_Base Bid & Alternate Layout | 8/24/2021 | 2.4 MB | ||
| 04-C-002_Project Control & Demolition Plan | 8/24/2021 | 2.6 MB | ||
| 05-C-101_Site Plan | 8/24/2021 | 2.4 MB | ||
| 06-C-102_Grading Plan | 8/24/2021 | 803.5 KB | ||
| 07-C-103_Grading Plan | 8/24/2021 | 265.1 KB | ||
| 08-C-104_Joint Plan | 8/24/2021 | 627.3 KB | ||
| 09-C-501_Details | 8/24/2021 | 340.4 KB | ||
| 10-C-502_Details | 8/24/2021 | 710.7 KB | ||
| 11-C-503_Details | 8/24/2021 | 2.7 MB | ||
| 12-C-801_Phasing Plan | 8/24/2021 | 705.5 KB | ||
| 13-C-802_Alternate No 1 Phase 5 | 8/24/2021 | 388.5 KB | ||
| 14-C-803_Erosion Control Plan | 8/24/2021 | 1.5 MB | ||
| 15-Traffic Control Plan | 8/24/2021 | 1.9 MB |