O2002-01 Parking Lot Rehabilitation Roberts State Office Building
The project includes replacing the existing parking lot, replacing the existing sidewalk & ensuring ADA compliance, improving drainage through storm sewer replacements & the addition of a gutter, final seeding and cover.
Issued for Bid
(click to expand/collapse)

Name | Date | Size | ||
00-Full PDF of Plans | 8/24/2021 | 12.5 MB | ||
01-G-001_Cover Sheet | 8/24/2021 | 142.3 KB | ||
02-G-002_General Notes | 8/24/2021 | 258.1 KB | ||
03-C-001_Base Bid & Alternate Layout | 8/24/2021 | 2.4 MB | ||
04-C-002_Project Control & Demolition Plan | 8/24/2021 | 2.6 MB | ||
05-C-101_Site Plan | 8/24/2021 | 2.4 MB | ||
06-C-102_Grading Plan | 8/24/2021 | 803.5 KB | ||
07-C-103_Grading Plan | 8/24/2021 | 265.1 KB | ||
08-C-104_Joint Plan | 8/24/2021 | 627.3 KB | ||
09-C-501_Details | 8/24/2021 | 340.4 KB | ||
10-C-502_Details | 8/24/2021 | 710.7 KB | ||
11-C-503_Details | 8/24/2021 | 2.7 MB | ||
12-C-801_Phasing Plan | 8/24/2021 | 705.5 KB | ||
13-C-802_Alternate No 1 Phase 5 | 8/24/2021 | 388.5 KB | ||
14-C-803_Erosion Control Plan | 8/24/2021 | 1.5 MB | ||
15-Traffic Control Plan | 8/24/2021 | 1.9 MB |