H2404-01 Replace HVAC, Multiple Assets-Fulton Treatment Center
Replacement of existing equipment with new equipment of a similar design. The new heating/cooling equipment will be a built up air handler with a heat pump & hydronic backup heat.
Addendum #1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| H2404-01 Add #1 | 761.0 KB |
Addendum #2
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| H2404-01 Add #2 | 160.2 KB |