W2401-01 Geological Survey, Replacement of HVAC & Upgrade Lighting - Buehler & Annex Buildings
Replacement of the existing HVAC system Heatpumps, a roof mounted Energy Recovery Unit, and the building lighting.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 01-Full Spec | 8.0 MB | ||
| 02-Division 00 | 3.3 MB | ||
| 03-Division 01 | 1.1 MB | ||
| 04-Division 23 | 703.5 KB | ||
| 05-Division 26 | 557.2 KB | ||
| 06-Appendix | 1.5 MB |