O2426-01 Rework Parking Lot & Sidewalks-George Washington Carver State Office Building
Removing & replacing the existing parking lot, mill & overlay of the existing drive around the building and providing storm water management for increase in pavement.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 01-Full Spec | 26.8 MB | ||
| 02-Division 00 | 1.3 MB | ||
| 03-Division 01 | 1.5 MB | ||
| 04-Division 02 | 89.0 KB | ||
| 05-Division 22 | 85.9 KB | ||
| 06-Division 31 | 197.3 KB | ||
| 07-Division 32 | 324.3 KB | ||
| 08-Division 33 | 75.4 KB | ||
| 09-Appendix 1 | 688.2 KB | ||
| 10-Appendix 2 | 13.4 MB | ||
| 11-Appendix 3 | 5.4 MB | ||
| 12-Appendix 4 | 618.3 KB |