C1923-01 Replace Emergency Genrator-Power Plant-Potosi Correctional Center

Replacement of existing emergency generators & automatic transfer switches at the Potosi Correctional Center Power Plant including the associated supporting equipment & building modifications.
Notification (click to expand/collapse)
Name Size
01-Full Spec 10.7 MB
02-Division 00 3.0 MB
03-Division 01 1.4 MB
04-Division 02 355.3 KB
05-Division 03 593.4 KB
06-Division 04 96.7 KB
07-Division 07 180.3 KB
08-Division 08 302.4 KB
09-Division 09 164.1 KB
10-Division 10 157.0 KB
11-Division 23 1.5 MB
12-Division 26 2.8 MB
13-Division 31 443.0 KB
14-Division 32 282.0 KB