M1905-01 HVAC Renovation-Albany Regional Office

The work at the Albany Regional Office consists of replacing the existing Fan Coil Units with a new Water Source Heat Pump system as well as providing a new Web Based Building Automation System. The new HVAC system will consist of one Closed Loop Cooling Tower, one Condensing Boiler, two Loop Pumps, and forty-six Water Source Heat Pump units.
Specifications (click to expand/collapse)
Name Size
01-Full Spec 6.2 MB
02-Division 00 2.7 MB
03-Division 01 1.8 MB
04-Division 22 1.0 MB
05-Division 23 1.7 MB
06-Division 26 1.0 MB
07-Division 28 121.4 KB