M1905-01 HVAC Renovation-Albany Regional Office

The work at the Albany Regional Office consists of replacing the existing Fan Coil Units with a new Water Source Heat Pump system as well as providing a new Web Based Building Automation System. The new HVAC system will consist of one Closed Loop Cooling Tower, one Condensing Boiler, two Loop Pumps, and forty-six Water Source Heat Pump units.
Addendum #1 (click to expand/collapse)
Name Date Size
M1905-01 Add #1 7/9/2021 561.5 KB