T2105-01 FMS Building Addition-St. Joseph Readiness Center

The Work consists of a new building addition or approximately 2,600 sq. ft. to the south side of the existing facility. The Work includes new CMU bearing walls with face brick, new steel framing, new standing seam metal roof, new exterior metal wall paneling, new bridge crane, new heating and ventilation, new vehicle exhaust system, site work and grading, new lighting, new wash bay, new fire detection and mass notification system, new translucent fiberglass sandwich panels, and new solar panels.
Addendum #1 (click to expand/collapse)
Name Date Size
T2105-01 Add #1 Plans 7/7/2021 2.0 MB
T2105-01 Add #1 Spec 7/7/2021 329.7 KB