C2007-01 Upgrade Water Treatment System, Power Plant-Farmington Correctional Center
The project includes, but is not limited to, the demolition of steam generators, replacement of existing pumped condensate & make-up water piping systems, the installation of a new reverse osmosis water treatment system, RO water storage tank, RO water feed pumps, & associated structural, plumbing, piping, insulation, power, control, & instrumentation systems.
Specifications
(click to expand/collapse)
Name | Date | Size | ||
01-Full Spec | 6/2/2021 | 9.8 MB | ||
02-Division 00 | 6/2/2021 | 2.8 MB | ||
03-Division 01 | 6/2/2021 | 1.6 MB | ||
04-Division 02 | 6/2/2021 | 354.9 KB | ||
05-Division 03 | 6/2/2021 | 610.6 KB | ||
06-Division 09 | 6/2/2021 | 201.2 KB | ||
07-Division 22 | 6/2/2021 | 565.1 KB | ||
08-Division 23 | 6/2/2021 | 2.9 MB | ||
09-Division 26 | 6/2/2021 | 1.5 MB |