C2007-01 Upgrade Water Treatment System, Power Plant-Farmington Correctional Center
The project includes, but is not limited to, the demolition of steam generators, replacement of existing pumped condensate & make-up water piping systems, the installation of a new reverse osmosis water treatment system, RO water storage tank, RO water feed pumps, & associated structural, plumbing, piping, insulation, power, control, & instrumentation systems.
Status
Bidding Closed
Prebid Date6/14/21 10:30am
Bid Date7/1/21 1:30pm
Company & Contacts
The State of Missouri Office of Administration
Chris Lloyd
christopher.lloyd@oa.mo.gov
Location
Farmington, MO
Documents can be ordered online or by contacting ADS at 1400 Forum Blvd, Suite 7A, Columbia, MO 65203, Ph: (573) 446-7768, Email: orders@adsmo.net. A hard copy set of documents is available for a refundable deposit of $30, CHECK ONLY, payable to ADS and a copy can be emailed to us before you mail them. A download is available for a purchase (non-refundable) of $30 that can be paid via credit card.
All bids should be submitted using Missouri Buys at THIS WEBSITE.